Verified Local Regulatory Information
Grid connection issues in Aeroes
The Specific Rule
The plan mentions investigating the rentability of energy storage (battery banks) in connection with the transition of the ferry route. Possibility of smart-grid solutions to avoid import during peak load and ensure more even distribution.
Source: Aeroes_Klimaplan_2022.pdf (HANDLINGSKATALOG, ENERGI, Handling 4; Handling 5 )
Does this rule apply to your Renewable Energy Project?
The Orklys Project Architect and Regulatory Navigator combines Aeroes's rules with market, technical and legal data to solve your project risks.