Browse 6 verified regulatory rules for renewable energy projects in Esbjerg municipality.
Local electricity production from solar cells on 20% of municipal roofs in 2030. Establishment of 5 RE plants driven by civil society/companies in 2030.
Page 13 (Målsætninger indenfor Energi)
Goal of establishing two wind turbine guilds of minimum 3 MW by 2030. Active work to avoid NIMBY effect through local ownership.
Page 16 (Tiltag E4)
The Esbjerg Declaration: Goal to increase offshore wind in the North Sea to at least 150 GW in 2050.
Page 7 (Esbjerg-erklæringen)
Creation of local wind turbine guilds and solar cell guilds. Citizens must feel the economic gain. Funds from Green Pool directed towards local areas with RE guilds.
Page 15-16 (Tiltag E4)
Use of the guild concept to establish several RE plants. Investigation of the spread of the guild concept in 2022.
Page 15 (Tiltag E4) & Page 50 (Hvordan vi kommer helt i mål)
Investigation of the possibility of gathering new solar cell plants under one energy company based on guidelines for corporate separation.
Page 16 (Virkemidler)