Browse 10 verified regulatory rules for renewable energy projects in Greve municipality.
Large solar field installations in the open country can be established but require balancing against agriculture/forestry. Guidelines must ensure added value for nature.
Pages 138-139 (Indsats 5.2.1)
Investigation of potential for new wind turbines including whether distance requirements can be met. Possibility of local opposition mentioned.
Page 140 (Indsats 5.2.2)
Includes 50% attribution of coastal offshore wind turbines in the target for renewable energy.
Page 143 (Effekt-afsnit)
The municipality may have a role in providing loan guarantees in connection with the establishment of production plants.
Page 64 (Kommunens rolle)
Requirements for company formation for solar cells on existing buildings are seen as a barrier; the municipality seeks a solution or change in framework conditions.
Page 91-92 (Indsats 3.5.2)
Streamlining the process for interested building owners and efficient approval of construction cases regarding solar cells.
Page 89 (Indsats 3.5.1)
Assessment of the potential for expanding capacity by upgrading current wind turbines (Repowering).
Not Specified in Climate Plan
Mentions that it is being investigated whether distance requirements etc. can be met for new wind turbines.
Page 140 (Mulige barrierer)
Cooperative-based approach green fund or energy communities are suggested to reduce local opposition to large RE plants.
Pages 139-140
The Orklys Project Architect combines Greve's rules with market, technical and legal data to solve your project risks.